Project Industry: Electricity

  • Alberta No. 1 Geothermal Exploration Wells

    Read More

  • Geomechanical Pumped Storage

    Storing Renewable Energy Underground Funded through ERA’s Partnership Intake Program in 2020, Quidnet Energy proposed a test facility for their Geomechanical Pumped Storage (GPS). While the overall objective of the project was to validate suitable geology for GPS in Alberta and construct, commission and test GPS storage with a solar facility, the project was ultimately

    Read More

  • Ultra Low Grade Energy Storage and ORC Power System

    Read More

  • Alberta No. 1 Geothermal Exploration Wells

    Read More

  • Grande Prairie Regional Energy Complex Development through Clean Hydrogen Deployment in Gas Turbines and Fuel Cell Electric Vehicles

    Read More

  • Network Protector Upgrade For DER Integration

    Read More

  • Shepard Energy Centre Carbon Capture Unit FEED Study

    Read More

  • Saddlebrook Solar + Storage

    Combining Double-Sided Solar Panels and a Battery Storage System This project was funded through ERA’s Biotechnology, Electricity and Sustainable Transport (BEST) Challenge in 2019 and aimed to demonstrate a double-sided solar panel paired with a battery storage system. While the novel solar panels were successfully installed and operated, the storage component of the project experienced

    Read More

  • Natel Energy, Inc. BRID Drop 5 Hydro Project

    This project proposed the installation of the first full-scale commercial demonstration of Natel’s updated modular hydropower turbine and civil engineering innovations. Funded through ERA’s Biotechnology, Electricity, and Sustainable Transportation (BEST) challenge and announced in 2019, the project hoped to reduce the costs and design complexity of hydropower projects while operating efficiently. The funding relationship was

    Read More

  • ENMAX Midstream Industrial Solar + Storage Project

    This project aimed to test the deployment of solar panels and lithium-ion storage solutions tailored to a specific light industrial facility. Funded through ERA’s biotechnology, electricity and sustainable transportation (BEST) challenge, ENMAX planned to shave demand peaks and maximize on-site renewable energy generation at the facility to reduce greenhouse gases (GHGs). The funding relationship was

    Read More